Boq for rcc work

WebBOQ AND SPECIFICATIONS FOR CIVIL, INTERIOR, FURNISHING, ELECTRICAL AND AIR-CONDITIONING WORKS OF DSH OFFICE AT FIRST FLOOR OF PANNA MAIN BRANCH S.No Description of Item Qty Unit Rate Amount S.No Description of Item Qty … WebParticipate online through e-Procurement website for Rcc Box tenders in Sikkim. Download Tender Documents, BOQ, Technical Bids for Rcc Box related Tenders from Sikkim. Get Bidding support for etenders related to Rcc Box Tenders in Sikkim. ... on lachen kalep between km 0.570 to km 17.803 for resurf work fy 2024 24 under 86 rcc . Due Date : Jan ...

Waterproofing BOQ Crystalline PDF Mortar (Masonry)

Webquantities of work ordered and carried out, as measured by the Contractor and verified by the Engineer and `valued at the rates and prices bid in the priced Bill of Quantities, where ... BOQ : (SECTION-I) Umreth – Vasad Road Km-0+000 to 19+250 (SH No-83) and Km-0+000 to 9+250 (SH No-188) Item No. DESCRIPTION . Unit . Quantity . Unit Rate ... WebBrick work with modular fly-ash lime bricks (FaLG Bricks) confirming to IS:12894-2002 of class designation 4.0 in foundation and plinth and super structure a.Cement Mortar 1:4 (1 Cement : 4 Coarse Sand) Cement concrete (Plain and RCC) Providing and laying nominal mix cement concrete with crushed stone aggregate using chemistry jobs malta https://austexcommunity.com

BOQ for Drainage work at coal handling area S.no Item …

http://www.constructioncivilengineering.com/data-of-bill-of-quantities.html WebFor rate analysis of RCC, we need to multiply each quantity with their rates to get the amount for every item of work. Rates vary from place to place and time to time. It is advisable to assume local rates or standard rates of the place. The sum total of all the … http://rpcl.portal.gov.bd/sites/default/files/files/rpcl.portal.gov.bd/page/75600d9f_2c02_4563_9b3d_9cdcff0b27c5/Community%20lot%201.pdf chemistry jobs in virginia

13 General Items of Work for Building Cost Estimation

Category:Quotation For Road Construction PDF Road Surface Concrete

Tags:Boq for rcc work

Boq for rcc work

BOQ AND SPECIFICATIONS FOR CIVIL, INTERIOR, …

WebFeb 19, 2024 · 18- Waterproofing work: It is measured in SQM or m2. 19- Hacking/ Roughening: It is measured in SQM or m2. 20- Fixing GI Mesh: It is measured in RMT or m. 21- Damp Proof Course: It is measured in SQM or m2. 22- Dismantling: It is measured in CUM or m3 & Sqm. m2 Both Depend upon Item. 23- Steel Work: Steel bars in RCC … http://www.europeanprogres.org/dokumenti/211_858653_1tboq-eng.pdf

Boq for rcc work

Did you know?

Web:One or more coats on old work 250.14 sqm 48.50 12131.79 2 Finishing walls with water proofing cement paint of required shade : Old work (one or more coats @ 2.20 kg/10 sqm) complete 232.00 sqm 36.95 8572.40 3 Finishing walls with Premium Acrylic Smooth exterior paint with Silicone additives of required shade Old work WebProcedure of BOQ preparation for RCC: Taking off is the procedure of studying the drawing as well as its specifications to find the parts needed for BOQ preparation. In that step, the suitable description of a specific work is specified to describe and explain the work …

WebItem of Work : RCC-M20 Rate Analysis for : 10.000 cu.mt Description : RCC M20 (1:1.5:3) concrete in Ordinary Works ... Estimates and Cost Abstracts can be prepared easily, by entering the BOQ quantities of the project. Program will automatically work out Material Take Off, Material Cost and Labour Cost involved in project, using the same rate ... WebCompound Wall BOQ - Free download as PDF File (.pdf), Text File (.txt) or read online for free. ... Qty RATE Rs/- AMOUNT A CIVIL WORKS 1.0 EARTH WORKS 1.1 Earth work in excavation by Mechanical means / Manual Means (Hydraulic Excavator) in All ... For RCC Foundations,PEDESTALS,COLUMNS & TIE BEAMS M 20 grade( Cement content …

Web11 Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete above plinth level for TMT bars of Fe500 grade Kg 500 12 Laying of RCC cover slabs with 1:1.5:3 with necessary curing and placing in position. … WebTwo or more coats on new work. sqm: 610. 5.5: 13.68. French spirit polishing : 13.68.1 . Two or more coats on new works including a coat of wood filler: sqm . 150: 5.6. 13.62: Painting with synthetic enamel paint of approved brand and manufacture of required colour to give an even shade: 13.62.1: Two or more coats on new work over an under coat ...

WebFINISHING & CLADDING WORK : 13.1 12 mm cement plaster of mix : 13.1.2 1:6 (1 cement: 6 fine sand) 600 Sqm. 13.2 15 mm cement plaster on the rough side of single or half brick wall of mix : 13.2.2 1:6 (1 cement: 6 fine sand) 600 Sqm. 13.44 Finishing walls with water proofing cement paint of required shade : 13.44.1 New work (Two or more coats ...

Webwood work, steel work, including T&P and scaffolding wherever necessary, disposal of unserviceable as well serviceable material with all leads and lifts beyond the ROW complete as per technical specification clause 202. a) Plain cement concrete Cum . 10 . b) … flight from orlando to newark nj todayWebAdvantages of BOQ. It provides final account settlement. Compare the rate of items easily. Provides schedule of rates and their valuation. It helps to control the overall cost of the construction projects. It makes an easy environment for contractors to create a low-cost and low-risk tender. BOQ easily finds which proportion to cement sand used ... flight from orlando to knoxville tnWebEasy way to Calculate Material Quantity from BOQ. Use of TOOLS 3. Calculation of quantity of Materials. In this tool, you can separately calculate the Quantity of all construction materials (i.e. Cement, Sand, Aggregate, reinforcement, bricks, etc) from each Item Works (i.e. PCC, RCC, Single Brick Flat Soling, Plaster, Brickwork- Morter, etc.) flight from orlando to houstonWebA-1.4 Reinforced Cement Concrete (RCC) Works RCC WORKS (f'c = 32 MPa, minimum f'cr = 40 MPa in nominal mix 1 : 1.25 : 2.5) With Stone Chips and Admixture (high strength concrete) using Steel Shutter 14 Reinforced cement concrete works using steel shutter with minimum cement content relates to mix ratio 1:1.25:2.5 having minimum f'cr = 40 Mpa, and chemistry jobs massachusettsWebguidelines for this type of work. Calculation per m3 of completely performed item. m3. 02-02. Third category soil excavation, up to foundation level, for waterproofing the external wall of basement at the level of vent shafts. Excavation shall be performed in grid of 4.5m for … flight from orlando to manilaflight from orlando to newark todayWebBesides, I have significant knowledge on Architecture; by interest, I do a lot of practical work in the field hence gained significant experience in this area. My area of expertise [RESIDENTIAL I INDUSTRIAL I COMMERCIAL]: • Performing Structural Analysis & Design with FEM of both RCC & STEEL Structure. • Developing BIM with Revit (RCC ... flight from orlando to new york jfk